Do not start the engine with help of starting sprays.
Preparation:
Conform with the following when starting engine with starting cable.
Ensure that jump lead wires are to appropriate cross-section s
IMPORTANT: Only repair those cables which show visible signs of damage. In
the event of
visible damage, make sure there is only one cable repair in effect after the
repair work. If no visible damage
Special tools required:
00 9 323
Necessary preliminary tasks:
Open storage box
Unclip trim (1) with special tool 00 9 323 at retaining points (2).
Disconnect associated plug connections.
Fig. 190: Identifying Trim And Special Tool 00 9 323
Press locks (1) together and press AUX connection so
The N52KP and N51 engine continue to use the conventional "manifold
injection" system carried over from the N52. The fuel supply components are also
carried over with regard to the EKP module, fuel pump etc.
Fig. 50: Identifying Fuel Supply System
N54 Engine
The N54 engine uses the new High Preci