Do not start the engine with help of starting sprays.
Preparation:
Conform with the following when starting engine with starting cable.
Ensure that jump lead wires are to appropriate cross-section s
IMPORTANT: Only repair those cables which show visible signs of damage. In
the event of
visible damage, make sure there is only one cable repair in effect after the
repair work. If no visible damage
WARNING: Danger of destruction in event of mechanical strain
Do not introduce any additional connections at the battery
negative
terminal.
Do not modify the grounding cable.
The grounding cable
REPLACING CONTROLLER SWITCH FOR ALTERNATOR (N62, N62TU)
Necessary preliminary tasks:
Disconnect battery negative lead
Remove ALTERNATOR
Carefully insert a screwdriver between cover (1) and threaded pin.
Lever out cover (1) towards top.
Fig. 48: Inserting Screwdriver Between Cover And Threaded
Fig. 3: Identifying Front Axle Components
A wheel/chassis alignment check must be carried out after the following work:
Release of following screw/bolt connections:
Steering gear to front axle carrier
Lower control arm to front axle carrier
Tie rod end to tie rod
Replacement of followi