The N54 and N52KP meet ULEV II requirements for 2007. There are not many
changes to the emission
systems on these engines. The N54 engine has 2 underbody catalysts in addition
to the "near engine" catalysts
already in use from the N52.
The N51 engine, however, is a SULEV II compliant engine which
Pedal Mounting Block
REMOVING AND INSTALLING (REPLACING) COMPLETE BEARING BLOCK FOR
FOOT PEDAL
Necessary preliminary tasks:
Remove pedal trim.
IMPORTANT: After completion of work, carry out function check.
Release screws (1).
Remove air duct (2).
Fig. 1: Identifying Air Duct And Screws
Disconne