Special tools required:
11 9 190
11 9 461
11 9 462
(cylinder bank 5 to 8)
Necessary preliminary tasks:
Remove servomotor for left eccentric shaft.
Remove left cylinder head cover.
Remove all
Special tools required:
11 9 190
11 9 461
11 9 462
(cylinder bank 1 to 4)
Necessary preliminary tasks:
Remove servomotor from right eccentric shaft.
Remove right cylinder head cover.
Remove
IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
Necessary preliminary tasks:
Switch off ignition
Disconnect battery negative lead.
Remove microfilter housing.
IMPORTANT: Follow instructions for removing and installing electronic
control units
RELAY CARRIER
Place special tool 61 1 153 on relay carrier (1) and carefully pull in
direction of arrow until retaining lugs (2) on
relay carrier are raised.
Fig. 257: Pulling Relay Carrier
Pull relay carrier (2) in direction of arrow into first catch (3).
Fig. 258: Pulling Relay Carrier Into Fir