IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
IMPORTANT: Aluminum-magnesium materials.
No steel screws/bolts may be used due to the threat of ele
IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
Necessary preliminary tasks:
Read out fault memory of DME control unit; if necessary, work through
IMPORTANT: Read and comply with notes on protection against
electrostatic damage (ESD
protection).
Necessary preliminary tasks:
Switch off ignition
Disconnect battery negative lead.
Remove microf
1. Quick-connect coupling with ID marking
Fig. 79: Identifying Quick-Connect Coupling With ID Marking Components
Removing:
Push quick-connect coupling (1) against pipe (4) (thereby relieving strain on
spring (2) ).
Press plastic ring (3) into quick-connect coupling (1) and remove coupling (1).
As
1.1 Working with aluminum dust:
Wear a fine dust mask.
E52 only: Use an explosion-proof extractor system.
Note national regulations.
1.2 Removing sealing materials
Hydrochloric acid is created when PVC sealing material is heated to
temperatures in excess of 180º
C.
Remove PVC sealing mat