Read contents of Body, General.
The steel-aluminum mixed construction is used on the vehicle.
Observe specific procedure.
Remove or cover those vehicle components in the repair area which are
susc
Read contents of Body, General.
Remove or cover those vehicle components in the repair area which are
susceptible to heat or dust.
Use only approved spot-welding apparatus for repairs.
Place vehic
Read contents of Body, General.
Spot-weld bonding is used on this vehicle. Observe specific procedure.
Remove or cover those vehicle components in the repair area which are
susceptible to heat or d
Special tools required:
11 9 190
11 9 461
11 9 462
(cylinder bank 5 to 8)
Necessary preliminary tasks:
Remove servomotor for left eccentric shaft.
Remove left cylinder head cover.
Remove all spark plugs on cylinder bank 5 to 8.
If necessary, remove fan cowl.
IMPORTANT: Screw (1) is a spec
NOTE: Camber and toe-in influence each other. Adjust the toe-in first
in order to
simplify the adjustment procedure.
Version with active front steering:
Align steering wheel.
Set cumulative steering angle by means of the service function "Carry
out initial operation/adjustment for
active fron