Before A/C efficiency test, satisfy following conditions:
1. Provide a MoDiC or DIS. Safeguard electrical system integrity by checking
the fault memory (no faults
in the fault memory).
2. Provide a t
WARNING: Although R 134a at normal temperature is non-toxic,
non-flammable and
not explosive in air in any mixture ratio, it is still essential to follow
various safety precautions.
The filled refrig
IMPORTANT: It is absolutely essential to read and comply with the
equipment manufacturer's
instructions for use provided in the equipment case!
Read and comply with the instructions for use provided
FLUSHING OIL COOLER WITH LINES (AUTOMATIC TRANSMISSION)
Special tools required:
17 2 018 17 2 010 SET OF ADAPTERS
17 2 019 17 2 010 SET OF ADAPTERS
NOTE: Carry out the work steps listed when:
Fitting a new or replacement transmission
Flushing can only be carried out with the automatic transmissi
REMOVING AND INSTALLING/REPLACING LEFT OR RIGHT B-PILLAR AIR VENT
Necessary preliminary tasks:
Remove B-pillar trim.
Unclip retaining clip (1) and feed out air vent (2) in upward direction.
Installation:
Replace damaged retaining clips (1).
Fig. 61: Identifying Air Vent Upward Positions
REMOVIN