BMW X5 Owners & Service Manuals

BMW X5: Instruments

READ NEXT:

 Instrument Cluster

REMOVING AND INSTALLING (REPLACING) INSTRUMENT CLUSTER IMPORTANT: Read and comply with notes on protection against electrostatic damage (ESD protection). NOTE: Comply with notes and instructions o

 Head-Up Display

REMOVING AND INSTALLING/REPLACING TRIM FOR HEAD-UP DISPLAY Special tools required: 00 9 317. Lever out trim for head-up display (1) with special tool 00 9 317 towards top. Fig. 2: Removing Lever I

 Lights

SEE MORE:

 Front Axle + Steering: Wheel/Chassis Alignment Check Must Be Carried Out After The Following Work

Fig. 3: Identifying Front Axle Components A wheel/chassis alignment check must be carried out after the following work: Release of following screw/bolt connections: Steering gear to front axle carrier Lower control arm to front axle carrier Tie rod end to tie rod Replacement of followi

 Removing And Installing/Replacing Left Intermediate Levers (N62 From 9/03 And N62TU)

Special tools required: 11 9 470 11 9 472 11 9 473 11 9 474 11 9 475 11 9 480 11 9 490 (cylinder bank 5 to 8) Removal of intermediate levers is described separately from installation. Necessary preliminary tasks: Remove servomotor for left eccentric shaft. Remove ignition coils on cylin

© 2019-2026 Copyright www.bmwx5info.com