REMOVING AND INSTALLING OR REPLACING BATTERY POSITIVE LEAD
(BETWEEN STARTER, ALTERNATOR AND BATTERY POSITIVE TERMINAL)
Necessary preliminary tasks:
Read out fault memory of DME control unit; if necessary, work through
test schedules.
Switch off ignition.
Disconnect battery negative lead.
Rem
1.0 Recommended tools and equipment
To carry out outer shell grinding work by hand or machine, you must use
the recommended tools
and equipment.
The work area can be cleaned with conventional extractor systems (low dust
concentration).
Weight-reduced aluminum front end structure (GRAV):
T