Special tools required:
11 9 470
11 9 473
(cylinder bank 5 to 8)
Removal of rocker arms is described separately from installation.
Necessary preliminary tasks:
Remove servomotor for left eccentr
Special tools required:
11 9 470
11 9 473
(cylinder bank 1 to 4)
Necessary preliminary tasks:
Removal of rocker arms is described separately from installation.
Remove servomotor for right eccen
REMOVING AND INSTALLING/REPLACING ALL VALVES (N62) (CYLINDER HEAD
REMOVED)
Preliminary tasks are described in DISASSEMBLING AND ASSEMBLING CYLINDER
HEAD.
Remove valve springs.
Remove valve stem sea
Load control of the N54 engine is effected by means of the throttle valve and
the waste gate valves.
The throttle valve is the primary component in this process. The wastegate
valves are actuated to bring about a
fine tuning of the boost pressure. At full load the throttle valve is completely
op