Special tools required:
36 1 030
Necessary preliminary tasks:
Check wheel bearings
Lift vehicle.
Check wheel with special tool 36 1 030 (measuring fixture) for lateral runout.
If applicable, r
Load control of the N54 engine is effected by means of the throttle valve and
the waste gate valves.
The throttle valve is the primary component in this process. The wastegate
valves are actuated to bring about a
fine tuning of the boost pressure. At full load the throttle valve is completely
op
IMPORTANT: Aluminum-magnesium materials.
No steel screws/bolts may be used due to the threat of electrochemical
corrosion.
A magnesium crankcase requires aluminum screws/bolts exclusively.
Aluminum screws/bolts must be replaced each time they are released.
The end faces of aluminum screws/bolts